Pier and Beam Foundation Repair Drawing
A solid pier and beam foundation keeps floors level and leaves crawl space access for plumbing and repairs down the road. ArcSite's pier and beam foundation repair drawing details a replacement pier from the footing up to the floor joists.
Key Features
This pier and beam foundation repair drawing includes:
- 10" round concrete pier with 3 #4 vertical bars
- #3 stirrups at 12" on center
- 2' wide by 1' deep footing with 4 #4 bars each way
- Footing set at least 2'6" below grade
- Triple 2x8 beam on top of the pier
- 2x6 floor joists at 16" on center
- Note to coordinate the pier-to-beam connection with an engineer
The footing has to bear on undisturbed soil at least 2'6" down, a spec worth checking against your local frost depth before you dig.
Accurate to scale
Industry specific
Ready made to share or export
Design tips
Key Considerations When Repairing a Pier and Beam Foundation
Frequently asked questions
Does this drawing show pier spacing?
No. It details a single pier, footing, and beam connection. Lay out spacing across the crawl space in ArcSite based on your engineer's plan.
Can I change the rebar or footing size?
Yes! You can edit any callout in ArcSite to match your engineer's spec.
Can my crew see the drawing in the field?
Yes. Your crew can open the same drawing on an iPad or Android tablet at the job, so the pier specs travel with them.








