Crawl Space Structural Repair Shop Drawing
Bouncy or sagging floors over a crawl space usually mean the joists need support partway across their span. ArcSite's crawl space structural repair shop drawing adds a supplemental steel beam on adjustable columns, spaced 10' max, under the existing joists.
Key Features
This crawl space structural repair shop drawing includes:
- Crawl space section from the foundation wall inward
- Floor joists and subfloor
- S4.4 x 7 steel beams under the joists
- Adjustable steel columns
- 10' max column spacing
- Gravel pads under each column
- Foundation wall with anchor bolt
Each column sits on its own gravel pad, sized to what the soil can bear, so check the ground before you set the first one.
Accurate to scale
Industry specific
Ready made to share or export
Design tips
Key Considerations When Designing a Crawl Space Structural Repair
Frequently asked questions
Why are the columns adjustable?
Your crew can raise the beam a little at a time to bring the floor back up, then lock each column at the right height. They can also be adjusted later if the house settles.
Can I add another beam run?
Yes! Copy a beam and its columns in ArcSite, then drag them under the next sagging section.
Will ArcSite still fit if my company grows?
It will. Office staff who only view drawings use free web-only seats, reps get paid seats, and managers get admin access, so you won't switch systems at 10 or 50 users.











