Electrical Inspection Drawing
An overhead electrical service has to pass inspection before the utility will connect power to a new build or a service upgrade. ArcSite's electrical inspection drawing shows the service mast from the service head down to the meter socket, with the clearances inspectors check.
Key Features
This electrical inspection drawing includes:
- Service head with splices to the service drop
- Insulator holding the service drop on the mast
- Mast through the roof with a rain boot
- 18" minimum clearance from the insulator to the roof
- Pipe clamp with lag screw, 4.5' max between attachments
- Meter socket at the base of the mast
The 18" minimum clearance is measured from the roof to the service drop attachment. That's one of the first things an inspector measures, so mark it on the drawing before the visit.
Fully customizable
Industry specific
Professional & accurate designs
Frequently asked questions
Does this drawing cover underground service?
No. It shows an overhead service through the roof. Draw an underground service entrance in ArcSite if that's what the job needs.
Can I add the panel and grounding?
Yes! Add the main panel, ground rods, and bonding in ArcSite to show the full service.
Can I send the inspector a copy before the visit?
Yes. Export the drawing from ArcSite and email it ahead of the visit, so the inspector knows what kind of service they're walking up to.